Finally
Yesterday the plumber arrived close to his scheduled time to reconnect everything so my master bathroom and kitchen are once again fully functional. It cost a lot more than the disconnect but he had a second guy this time and had to do a couple additional things. I was too happy to have everything back together to fuss much about it. In addition he disconnected the guest bathroom plumbing so that cabinet counter swap can get rolling soon. I absolutely love the final outcome. Everything looks great, it appears the installers did a very professional job. I saw zero flaws.
Last night I ran Elsa to Ali’s place. It took me roughly the same amount of time as it did from the old house which surprised me a bit since I am further south. Elsa was thrilled to see Ali and Shugs as always. I enjoyed a taco dinner with them before pushing back for home.
I have a brief work day before I leave to drive up to Titusville for an IT conference which runs until Friday. It will be a good chance for me to reset and reflect in surroundings different than I am accustomed to.